No to Boracay Bridge: Aklan Government Rejects SMC Infrastructure Proposal
“Infrastructure development must not come at the expense of long-term environmental damage.”
Published on Nov 17, 2025
(SPOT.ph) Tourists hoping for a faster land route to Boracay will have to stick with the current setup. Aklan has formally rejected San Miguel Corporation’s (SMC) proposed 2.54-kilometer bridge linking the island to mainland Malay, saying the project raises more risks than benefits.
The P7.95 billion bridge would have connected Boracay directly to the mainland—essentially changing how everyone enters the island—but the Provincial Board of Aklan stated the project never gained the backing of the people who would feel its effects first.
“The bridge will destroy the allure of Boracay as an island destination known for its white sand beaches and captivating marine environment,” it said in Resolution No. 193-2025. “Infrastructure development must not come at the expense of long-term environmental damage.”
Officials point out that residents of Malay were not adequately consulted for the project, even though the bridge would cut straight through their daily routines. According to the Caticlan-Boracay Transport Multi-Purpose Cooperative (CBTMPC), around 40 employees and 414 boatmen, along with 2,200 dependents, would lose their livelihoods should ferry services be replaced by a fixed bridge.
Environmental concerns played a significant role in the decision. Boracay’s surrounding waters include coral reefs and seagrass beds that could be disturbed by foundation work, dredging, and increased traffic. The province also flagged the risk of water and air pollution, noting that allowing vehicles onto the island adds pressure to an ecosystem that only recently recovered from its rehabilitation.
There’s also the fact that Aklan earns significantly from terminal fees and local taxes collected from boat traffic—over P600 million in annual revenue, to be exact—that provincial services, including hospital operations and other social programs.
Also read: 10 Places to Visit in Aklan Aside From Boracay
What is the Boracay Bridge?
The bridge has been the subject of talks for years. SMC had first submitted the unsolicited proposal back in 2018, with the Department of Public Works and Highways (DPWH) steadily pushing it through the PPP evaluation process. Earlier this year, DPWH even released bidding documents, a sign the agency was preparing to move the project toward formal approval.
However, in July, the Malay Municipal Council removed the proposal to construct the bridge from its Comprehensive Land Use Plan (CLUP) and Annual Investment Plan (AIP).
For now, the routine stays the same for travelers: fly into Caticlan, catch a boat, and take in that first glimpse of Boracay from the water.
Also read: Where to Eat in Boracay: 10 Must-Try Restaurants in Boracay

Micah believes that writing is always political. Beyond the byline, you’ll find her bruising herself in a pole studio or napping with her beagle. Reach her at micah@spot.ph.